Installing the controllers and drive trays into the cabinet requires some preparation.
About this task
You must do the following to prepare the site:
- Prepare the site for the cabinet and its requirements: for example, temperature, humidity, altitude range, airflow, heat dissipation, wiring, power, and grounding.
- Prepare the network for the controllers.
- Ensure that the cabinet in which the appliance will be mounted meets the installation site specifications for E-Series storage array components.
For details, see the E-Series Storage System Site Preparation Guide.