If you have not received the equipment already installed in cabinets, you must rack the components.
This task must be performed on both MetroCluster sites.
SAS Disk Shelves Installation and Service Guide for DS4243, DS2246, DS4486, and DS4246
For more information and an illustration of the installation, see the ATTO FibreBridge 6500N Installation and Operation Manual.
The bridge Ready LED might take up to 30 seconds to illuminate, indicating that the bridge has completed its power-on self test sequence.